| Rubric | Offer |
| ||||||||||
| Date | 21.09.2006 | |||||||||||
| Contact details | ||||||||||||
| 2 x Units Steel Structure Hall |
| 2 x Units Steel Structure Hall
Halls are especially suitable for Forwarding Companies, Trucking Companies, Bus Companies or for storage purposes. Halls would also be suitable for production facilities without overhead mounted cranes. Statics of buildings is calculated for snow load(roof) of 50 kp per square meter; in case Of relocation to geographical areas having higher basic snow load spacing between pillars will have to be reduced (maximum 5m) Steel structures for both halls have a total weight of approximately 1200 t. Hall 1 has a sideaisle of approx. 15 m equipped with steel structure to accommodate a mezzanine (concrete floor on trapezoid steel profiles) for about 2/3 of lentgh of hall. Rebuilding of mezzanine is an option , but not mandatory. Complete steel structure is connected / assembled by nut and bolt system. Consequently re-erection will be quite easy. For both Halls steel purlins are mounted on steel trusses(girders) in longitudinal direction of halls. Distance between purlins is 2,40 m. Roof was carried by across hall on steel trusses(girders) mounted steel trapezoid Profiles. Facades were made of horizontal cassettes(panels) and vertical steel trapezoid profiles. Both halls are stored completely dismantled and itemized/marked at location. ....... Hall 1 Length: approx. 160m Distance between pillars: 10m Width: approx. 47m Span length of truss(girder): 32m and 15m (2-aisles) Height: approx. 9m Hall 2 Length: approx. 130m Distance between pillars: 10m Width: approx: 45m Span length of truss(girder): 32m and 13m (2-aisles) Height: approx. 7m Complete set of construction drawings etc. is availble The halls 1 and 2 have been dismanteld and are packed in boxes and on pallets. In general we have roughly 40-45 trucks available. Amount is roughly 1.000 to steel and other materials. Panels are Aluminium with Isolation. |
|